Framework agreement
Design & Build Framework
Run by UK Atomic Energy Authority · 4 lots
- 17
- Suppliers appointed
- £8m
- Value ceiling
- 4 Sept 2026
- Ends
- 0
- Call-offs found
Tell me when it ends: a free email a year, six months and three months before, when its replacement is usually advertised.
Who is on it
17 appointed suppliers
17 appointed.
- 3-SCI LTD
- ALTRAD BABCOCK LIMITED
- AMENTUM CLEAN ENERGY LIMITED
- AQUILA NUCLEAR ENGINEERING LIMITED
- ARTNEER LIMITED
- Atkins
- ATKINSRÉALIS UK LIMITED
- Cosylab d.d.
- DEMCON high-tech systems Enschede B.V.
- EADON CONSULTING LIMITED
- FRAZER-NASH CONSULTANCY LIMITED
- KINECTRICS UK LIMITED
- Kyoto Fusioneering UK Ltd.
- M5TEC LIMITED
- MCANDREW MARTIN LIMITED
- OXFORD SIGMA LIMITED
- RED ENGINEERING LIMITED
What has come through it
Call-off contracts
No call-off contract in our data names this framework as its parent. That is not the same as nothing having been bought through it: only a minority of call-off notices declare their parent, so silence here means the notices were quiet, not that the framework was.
What it covers
Categories on this framework
Be ready for the next one
Tender Radar tells you when a framework in your market comes up for renewal, months before the notice appears, and shows you which ones your competitors are on and you are not.
Common questions
About this framework agreement
Who is on the Design & Build Framework framework agreement?
17 suppliers are appointed. They are listed on this page, taken from the award notice UK Atomic Energy Authority published.
When does it end?
4 Sept 2026. Re-procurement for a framework of this size usually starts six to twelve months before that, so the opportunity to get on the next one is earlier than the date suggests.
How much has been bought through it?
No contract we hold is tied to this framework. That does not mean nothing has been bought through it, only that the call-offs did not say so in their notices.
Can I still join it?
Not usually. A framework is closed once awarded, and the next opportunity is the re-procurement before it ends.
Sourced from the notices UK Atomic Energy Authority published to Find a Tender under the Open Government Licence v3.0. Figures cover contract award notices published from January 2021 onward, with comprehensive coverage from 2023. Earlier contracts, and any award not published to Find a Tender or Contracts Finder, will not appear.
How to cite this data
Tender Radar (2026) Design & Build Framework [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/frameworks/design-and-build-framework-054574 (Accessed: 27 November 2026).