Framework agreement
Civil Engineering Contractors Framework (CECF) 2026-2030
Run by NY HIGHWAYS LIMITED · 2 lots · call-offs by direct award or mini-competition
- 16
- Suppliers appointed
- £25m
- Value ceiling
- 31 Mar 2030
- Ends
- 4
- Call-offs found
Tell me when it ends: a free email a year, six months and three months before, when its replacement is usually advertised.
Who is on it
16 appointed suppliers
16 appointed.
- AMMLEE GROUP INTERNATIONAL LIMITED
- BETHELL CONSTRUCTION LIMITED
- C.R. REYNOLDS LIMITED
- COATING SERVICES LIMITED
- EC SURFACING LTD
- FOX (OWMBY) LIMITED
- HINKO CONSTRUCTION LTD
- KS CIVILS & GROUNDWORKS LTD
- METCALFE PLANT HIRE LIMITED
- PBS CONSTRUCTION (NORTH EAST) LIMITED
- RAINTON CONSTRUCTION LIMITED
- SEYMOUR (CIVIL ENGINEERING CONTRACTORS) LTD.
- THOMAS ARMSTRONG (CONSTRUCTION) LIMITED
- VERTEX CONSTRUCTION & CIVIL ENGINEERING LTD
- VolkerLaser Ltd
- WILF NOBLE CONSTRUCTION & PLANT HIRE LIMITED
Who is winning from it
A place on the framework is not the same as the work
Ranked by call-offs we can tie back to this framework. On a crowded framework the work usually concentrates in a handful of suppliers, which is worth knowing before you spend three weeks applying.
| Supplier | Call-offs | Value |
|---|---|---|
| Wilf Noble Construction & Plant Hire Limited | 2 | £198,623 |
| PBS Construction (North East) Limited | 1 | Not stated |
| VolkerLaser Limited | 1 | Not stated |
What has come through it
Call-off contracts
| Contract | Buyer | Won by | Value | Awarded |
|---|---|---|---|---|
| Low Eggborough Drainage Alterations 2026 | The North Yorkshire Council | VolkerLaser | Not stated | 20 Oct 2026 |
| Barton Footbridge Strengthening | The North Yorkshire Council | PBS Construction (North East) Ltd | Not stated | 7 Oct 2026 |
| Cayton Carr Culvert Maintenance Works | The North Yorkshire Council | Wilf Noble Construction & Plant Hire Ltd | £99,311.5 | 2 Jun 2026 |
| Cayton Carr Culvert Maintenance Works | The North Yorkshire Council | Wilf Noble Construction & Plant Hire Ltd | £99,311.5 | 2 Jun 2026 |
These are call-offs whose own notice names this framework as its parent, which is how we know rather than how we guess. Most call-off notices do not say, so this is a floor and not a total.
What it covers
Categories on this framework
Be ready for the next one
Tender Radar tells you when a framework in your market comes up for renewal, months before the notice appears, and shows you which ones your competitors are on and you are not.
Common questions
About this framework agreement
Who is on the Civil Engineering Contractors Framework (CECF) 2026-2030 framework agreement?
16 suppliers are appointed. They are listed on this page, taken from the award notice NY HIGHWAYS LIMITED published.
When does it end?
31 Mar 2030. Re-procurement for a framework of this size usually starts six to twelve months before that, so the opportunity to get on the next one is earlier than the date suggests.
How much has been bought through it?
4 call-off contracts are tied to this framework, 4 of them because the notice declares it as their parent and the rest because they name it in their own text. The 4 most recent are listed above, worth £198,623 where a value was published. Treat it as a floor: many call-off notices say nothing about the framework they were let under.
Can I still join it?
Not usually. A framework is closed once awarded, and the next opportunity is the re-procurement before it ends.
Sourced from the notices NY HIGHWAYS LIMITED published to Find a Tender under the Open Government Licence v3.0. Figures cover contract award notices published from January 2021 onward, with comprehensive coverage from 2023. Earlier contracts, and any award not published to Find a Tender or Contracts Finder, will not appear.
How to cite this data
Tender Radar (2026) Civil Engineering Contractors Framework (CECF) 2026-2030 [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/frameworks/civil-engineering-contractors-framework-cecf-2026-2030-05f6f6 (Accessed: 27 November 2026).