Awarded

General Construction Framework

Merseyrail Electrics 2002 Limited awarded this framework to 11 suppliers.

Not stated
Framework ceiling
Not stated
Runs until
11
Suppliers

Find tenders for your company

Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.

Already know you want it? Start your free month

What is being bought

The General Construction Works Framework has been let on a 3 (three) year term with options to extend for a further 4 (four) years in 12 (twelve) month increments, resulting in a maximum framework term of seven (7) years.

The purpose of the Framework is to provide multiple competent and proven Suppliers under a framework agreement who can provide a wide range of construction works including working on underground / sub-stations and near the operational railway.

Read the full description

As a general guide, construction works cover almost any work that is done to a permanent or temporary building or structure, civil engineering work or new asset installation works. The following works are anticipated delivered through the framework, including but is not limited to:

• Gas, Electrical and other associated Utility works

• Mechanical Works

• General Construction Works, including small scale demolition activities.

• High / Low Voltage Works

• Civils Works. Excavation, Backfill and reinstatement activities.

• CIS / Comms / Public address systems.

• HVAC

• Signage, shelters and other associated station infrastructure activities.

• Vegetation / Landscaping

• Underground Station / Sub-Surface Fire Requirements

MEL have split the lots by value into three lots and restricted Lot 1 to SMEs only.

The Lots are:

• Lot 1 - £100,000 - £1.5 Million

• Lot 2 - £1.2 Million - £3 Million

• Lot 3 - Over £2.5 Million

The overall objectives of the framework are:

• Enhance safety standards on all construction projects undertaken;

• Provide sustainability and environmental responsibility;

• Deliver best value across all stages of delivery;

• Increased Client and Customer satisfaction;

• Quality Assurance and compliance to MEL and Network Rail Standards;

• Effective risk management;

• Regulatory compliance;

• Promote innovation and technology integration;

• Community engagement;

• Ensure the supplier competencies are maintained throughout the lifecycle of the Framework;

• Provide an efficient means of engaging the supply chain to ensure projects have minimal procurement delays and enables delivery on time;

• Contract with multiple Suppliers who can meet the requirements as set out in the relevant Lots to drive best value through competition; and

• Suppliers have already been vetted and therefore the process of tendering or direct awarding construction works is more efficient with assurance of suitability and compliance.

The new framework allows for direct award options (up to current and future threshold values), quotes and mini competitions.

The framework will be let as a zero-value contract, allowing for a large range of works to be covered under this contract to promote best value.

Merseyrail Electrics 2002 Limited

Since 2021, Merseyrail Electrics 2002 Limited has awarded 1 contract in this category.

Everything Merseyrail Electrics 2002 Limited buys

Similar contracts coming back to market

Contracts in the same category at other buyers, ending in the next 18 months.

How to cite this data

Tender Radar (2026) General Construction Framework: Merseyrail Electrics 2002 Limited [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-h6vhtk-04bcde (Accessed: 27 November 2026).

The figures change as notices are published, so the citation carries the date you read them.

From Find a Tender, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-h6vhtk-04bcde.