Awarded
General Construction Framework
Merseyrail Electrics 2002 Limited awarded this framework to 11 suppliers.
- Not stated
- Framework ceiling
- Not stated
- Runs until
- 11
- Suppliers
Find tenders for your company
Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.
Who won (11)
- SIS Projects LtdSME, as the notice states
- Frank Rogers Building Contractor LtdSME, as the notice states
- Simon Dean Electrical LimitedSME, as the notice states
- Pod-Trak Limited
- Vallum Projects LimitedSME, as the notice states
- Spencer Rail Engineering Limited
- MPH Construction LimitedSME, as the notice states
What is being bought
The General Construction Works Framework has been let on a 3 (three) year term with options to extend for a further 4 (four) years in 12 (twelve) month increments, resulting in a maximum framework term of seven (7) years.
The purpose of the Framework is to provide multiple competent and proven Suppliers under a framework agreement who can provide a wide range of construction works including working on underground / sub-stations and near the operational railway.
Read the full description
The General Construction Works Framework has been let on a 3 (three) year term with options to extend for a further 4 (four) years in 12 (twelve) month increments, resulting in a maximum framework term of seven (7) years.
The purpose of the Framework is to provide multiple competent and proven Suppliers under a framework agreement who can provide a wide range of construction works including working on underground / sub-stations and near the operational railway.
As a general guide, construction works cover almost any work that is done to a permanent or temporary building or structure, civil engineering work or new asset installation works. The following works are anticipated delivered through the framework, including but is not limited to:
• Gas, Electrical and other associated Utility works
• Mechanical Works
• General Construction Works, including small scale demolition activities.
• High / Low Voltage Works
• Civils Works. Excavation, Backfill and reinstatement activities.
• CIS / Comms / Public address systems.
• HVAC
• Signage, shelters and other associated station infrastructure activities.
• Vegetation / Landscaping
• Underground Station / Sub-Surface Fire Requirements
MEL have split the lots by value into three lots and restricted Lot 1 to SMEs only.
The Lots are:
• Lot 1 - £100,000 - £1.5 Million
• Lot 2 - £1.2 Million - £3 Million
• Lot 3 - Over £2.5 Million
The overall objectives of the framework are:
• Enhance safety standards on all construction projects undertaken;
• Provide sustainability and environmental responsibility;
• Deliver best value across all stages of delivery;
• Increased Client and Customer satisfaction;
• Quality Assurance and compliance to MEL and Network Rail Standards;
• Effective risk management;
• Regulatory compliance;
• Promote innovation and technology integration;
• Community engagement;
• Ensure the supplier competencies are maintained throughout the lifecycle of the Framework;
• Provide an efficient means of engaging the supply chain to ensure projects have minimal procurement delays and enables delivery on time;
• Contract with multiple Suppliers who can meet the requirements as set out in the relevant Lots to drive best value through competition; and
• Suppliers have already been vetted and therefore the process of tendering or direct awarding construction works is more efficient with assurance of suitability and compliance.
The new framework allows for direct award options (up to current and future threshold values), quotes and mini competitions.
The framework will be let as a zero-value contract, allowing for a large range of works to be covered under this contract to promote best value.
Merseyrail Electrics 2002 Limited
Since 2021, Merseyrail Electrics 2002 Limited has awarded 1 contract in this category.
Everything Merseyrail Electrics 2002 Limited buysSimilar contracts coming back to market
Contracts in the same category at other buyers, ending in the next 18 months.
- Offsite Construction Solutions - Lots 1, 2, 3 & 4 extension
Government Commercial Agency · held by Not Applicable · £9.5bn · ends 30 Sept 2027
- National Contractor Framework
Alder Hey Children's NHS Foundation Trust · held by A Buckler (Haulage) Ltd, Aptus Construction Ltd and others · £8.0bn · ends 31 Aug 2027
- Major Projects Framework 2
Places for People Group Limited · held by Robertson Construction Group Limited, Willmott Dixon Construction Limited and others · £4.2bn · ends 3 Apr 2028
- EN:Procure - Framework for Installation, Servicing, Maintenance and Repair Works (GEN4)
EN Procure Ltd · held by A. Connolly Limited, Aaron Services Limited and others · £3.2bn · ends 25 Feb 2028
- prj_4859 - MOJ Constructor Services Framework
Ministry of Justice · held by Wates Construction Limited, ISG Construction Limited and others · £2.5bn · ends 16 Feb 2028
- ALL LOTS
LHC for the Scottish Procurement Alliance (SPA) · held by Bancon Construction Limited, Clark Contracts Limited and others · £750.0m · ends 30 Apr 2027
How to cite this data
Tender Radar (2026) General Construction Framework: Merseyrail Electrics 2002 Limited [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-h6vhtk-04bcde (Accessed: 27 November 2026).
From Find a Tender, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-h6vhtk-04bcde.