Ended 31 Mar 2025

CEFAS24-135 Contract for a ground truthing survey of The Wash and approaches

Cefas awarded this to Ocean Ecology Limited for £63k, running until 31 Mar 2025.

£63k
Value
31 Mar 2025
Ended
1
Supplier

Find tenders for your company

Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.

Already know you want it? Start your free month

Who won

What is being bought

The Marine Protected Area (MPA) monitoring programme is funded by the Department for Environment, Food and Rural Affairs (DEFRA) and through this programme, Cefas co-ordinates some of the evidence collection for the monitoring of MPAs in English waters.

Read the full description

The Ross Worm Sabellaria spinulosa is a sedentary, epifaunal polychaete worm which builds tubes by consolidating particles of sediment (Limpenny et al, 2010). S. spinulosa is abundant in UK waters, largely existing in solitary form or within small, low-lying aggregations (Hayward and Ryland, 1990). However, under the right environmental conditions they also can establish dense colonies and form biogenic reefs. These biogenic reefs are protected as an Annex I habitat under the EU Habitats Directive (EEC, 1992), and Special Areas of Conservation (SACs) are designated for their protection.

Important areas of consistently occurring reef have been found across The Wash where extensive areas of subtidal mixed sediments in the tide-swept approaches provide the right conditions for reefs to form, particularly in deeper waters. These reefs are an important but understudied feature of both The Wash and North Norfolk Coast (WNNC) SAC and Inner Dowsing, Race Bank and North Ridge (IDRBNR) SAC - named as 'The Wash and its approaches' hereafter.

Requirement:

With the aim of improving our understanding of the extent, distribution, and nature of S. spinulosa biogenic reef (i.e. reefiness) across The Wash and its approaches, Cefas are commissioning this contract to deliver a ground truthing survey. The evidence gathered in this acoustic survey will seek to allow for the identification of Annex I S. spinulosa reefs.

This evidence will be used to support conservation advice, condition assessment and management of the WNNC SAC and the IDRBNR SAC, its designated sites and protected features, i.e. Reefs (including S. spinulosa biogenic reef) habitat. This information will inform statutory advice on MPAs and assist in the assessment of both SAC sites' condition.

Cefas

Since 2021, Cefas has awarded 7 contracts in this category, worth £987k across the 7 that published a value.

Everything Cefas buys

Similar contracts coming back to market

Contracts in the same category at other buyers, ending in the next 18 months.

How to cite this data

Tender Radar (2026) CEFAS24-135 Contract for a ground truthing survey of The Wash and approaches: Cefas [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-b5fd17-625caa9b-253f-46ce-b2c9-6b7e4b80fd36 (Accessed: 27 November 2026).

The figures change as notices are published, so the citation carries the date you read them.

From Contracts Finder, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-b5fd17-625caa9b-253f-46ce-b2c9-6b7e4b80fd36.