Framework agreement
Design, Supply and Installation of Permanent and Temporary Modular Buildings
Run by LHC Procurement Group for the Welsh Procurement Alliance (WPA) · 4 lots
- 33
- Suppliers appointed
- £150m
- Value ceiling
- 27 May 2024
- Expected to end by (our estimate)
- 0
- Call-offs found
Who is on it
33 appointed suppliers
33 appointed.
- Algeco UK Ltd
- Davro Site Services Limited
- Explore Modular Limited
- Explore Modular Ltd
- Healthmatic
- Healthmatic Ltd
- Integra Buildings Limited
- Integra Buildings Ltd
- MCAVOY MODULAR OFFSITE LIMITED
- McAvoy Modular Offsite Limited
- Modularwise Ltd
- Modularwise Ltd.
- Modulek Ltd
- P McVey Building Systems
- P McVey Mobile Buildings Ltd
- Portakabin (Scotland) Ltd
- PORTAKABIN LIMITED
- Portakabin Limited
- Portakabin Ltd
- Premier Modular Limited
- Rollalong Limited
- Sibcas Limited
- Sibcas Ltd
- Silwood Facilities Ltd
- Thurston Group Limited
- Vanguard Healthcare Solutions Limited
- Vanguard Healthcare Solutions Ltd
- VISION BUILT LIMITED
- Vision Built Structures Ltd
- WERNICK BUILDINGS LIMITED
- Wernick Buildings Ltd
- WESTERN BUILDING SYSTEMS LTD
- Western Building Systems Ltd
What has come through it
Call-off contracts
No call-off contract in our data names this framework as its parent. That is not the same as nothing having been bought through it: only a minority of call-off notices declare their parent, so silence here means the notices were quiet, not that the framework was.
What it covers
Categories on this framework
Be ready for the next one
Tender Radar tells you when a framework in your market comes up for renewal, months before the notice appears, and shows you which ones your competitors are on and you are not.
Common questions
About this framework agreement
Who is on the Design, Supply and Installation of Permanent and Temporary Modular Buildings framework agreement?
33 suppliers are appointed. They are listed on this page, taken from the award notice LHC Procurement Group for the Welsh Procurement Alliance (WPA) published.
When does it end?
No end date was published, so this is our estimate: by 27 May 2024, four years after it was awarded, which is the usual maximum term for a framework. It may end sooner. Re-procurement usually starts six to twelve months before a framework ends, so the opportunity to get on the next one is earlier than the date suggests.
How much has been bought through it?
No contract we hold is tied to this framework. That does not mean nothing has been bought through it, only that the call-offs did not say so in their notices.
Can I still join it?
Not usually. A framework is closed once awarded, and the next opportunity is the re-procurement before it ends.
Sourced from the notices LHC Procurement Group for the Welsh Procurement Alliance (WPA) published to Find a Tender under the Open Government Licence v3.0. Figures cover contract award notices published from January 2021 onward, with comprehensive coverage from 2023. Earlier contracts, and any award not published to Find a Tender or Contracts Finder, will not appear.
How to cite this data
Tender Radar (2026) Design, Supply and Installation of Permanent and Temporary Modular Buildings [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/frameworks/design-supply-and-installation-of-permanent-and-temporary-modular-046f54 (Accessed: 27 November 2026).