Ended 31 Mar 2026
Cutty Sark - Fall Prevention System
National Maritime Museum awarded this to Ethos Facilities ltd for £91k, running until 31 Mar 2026.
- £91k
- Value
- 31 Mar 2026
- Ended
- 1
- Supplier
Find tenders for your company
Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.
Who won
- Ethos Facilities ltd
1 other contract with National Maritime Museum since 2021
What is being bought
1.Royal Museums Greenwich (RMG) constitutes several Sites and Buildings across a large area within the Royal Borough of Greenwich. They encompass the National Maritime Museum (NMM), the Royal Observatory (ROG), the Cutty Sark (CS), and the Queen’s House (QH). These four world-class attractions sit at the heart of Maritime Greenwich in a UNESCO World Heritage Site.
Read the full description
1.Royal Museums Greenwich (RMG) constitutes several Sites and Buildings across a large area within the Royal Borough of Greenwich. They encompass the National Maritime Museum (NMM), the Royal Observatory (ROG), the Cutty Sark (CS), and the Queen’s House (QH). These four world-class attractions sit at the heart of Maritime Greenwich in a UNESCO World Heritage Site.
2.Cutty Sark is a celebrated historic sailing ship launched 1869 and was fastest tea clipper of its time, it is now an award-winning visitor attraction in Greenwich, London. It is managed and maintained by Royal Museums Greenwich, who are based at the National Maritime Museum.
3.The dry dock on the bank of the River Thames at Greenwich received Cutty Sark by water in 1954. The dry dock was drained and Cutty Sark exhibited in the open air until its restoration 2006-2012 when it was enclosed around the waterline with a glass roof. The dry dock became a basement where visitors can walk around and under the ship’s hull and which holds a café, exhibitions and events space.
4.Cutty Sark requires regular cleaning, maintenance and conservation. Many of the required activities must be undertaken from on top of the glass waterline roof. These activities might be cleaning the glass roof itself, ship exterior inspections, conservation and repairs, or replacements of hull timber planks individually or in sections.
5.The work requires access onto the roof which creates a work-at-height issue. A Fall Prevention (Latchway) System is required for the safety of workers. An existing installed system is aged and can no longer be proven to comply with evolving regulations.
6.A replacement of the Fall Prevention System is required to be designed, fabricated and installed by the Contractor. This will be the Contractor’s design responsibility under this design and build contract. The system must be fitted to the historic ship’s hull which will require collaboration with the Employer’s appointed Structural Engineer and conservation team.
7.RMG seeks contractors who are accredited / approved fall arrest and prevention designers and installers to carry out this work.
8.The works must be completed by 31st March 2026.
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=993765327
National Maritime Museum
Since 2021, National Maritime Museum has awarded 1 contract in this category, worth £91k across the 1 that published a value.
Everything National Maritime Museum buysSimilar contracts coming back to market
Contracts in the same category at other buyers, ending in the next 18 months.
- Personal Protective Equipment (PPE) 2024 - 2026
Ministry of Justice · held by Arco Limited · £3.6m · ends 27 Dec 2026
- Structural Firefighter PPE
Greater Manchester Combined Authority · held by Ballyclare Limited · £3.1m · ends 19 Apr 2027
- Low Level Waste Assay System at Berkeley & Oldbury Site
NRS Ltd · held by Mirion Technologies (Canberra UK) Ltd · £1.5m · ends 30 Nov 2026
- DNA Boilers - Purchase of Waste Monitoring Equipment
NRS · held by Ludlum Systems Ltd · £1.2m · ends 5 Jul 2027
- Lifejackets and Marine Goods, Repairs Servicing and Maintenance
Environment Agency · held by Survival One · £950k · ends 26 Apr 2027
- Polymerase Chain Reaction (PCR) Equipment
Merseyside Fire and Rescue Authority · held by Southern Scientific Limited · £780k · ends 31 Mar 2027
How to cite this data
Tender Radar (2026) Cutty Sark - Fall Prevention System: National Maritime Museum [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-h6vhtk-0587ca (Accessed: 27 November 2026).
From Find a Tender, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-h6vhtk-0587ca.