Running until 10 Nov 2027

WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools

Wiltshire Council awarded this to Stepnell Limited for £6.1m, running to 10 Nov 2027.

£6.1m
Value
10 Nov 2027
Runs until
1
Supplier

Find tenders for your company

Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.

Already know you want it? Start your free month

What is being bought

Wiltshire Council intend to appoint a main Contractor via a two-stage procurement opportunity to deliver an important project on a full design and build basis across three primary schools in Wiltshire.

Stage 1 of the procurement process is to seek expressions of interest from prospective Contractors with a view to shortlisting a maximum of four Contractors to be invited to submit a tender for the project.

Stage 2 of the procurement process will be the Invitation to Tender (ITT) itself.

The Requirement:

Read the full description

The following schools have been identified by the Council as having temporary classrooms which are in a dilapidate state and are in need of replacement by way of either new build developments (Hullavington and Minety), and internal alterations and refurbishment of existing school buildings (Frogwell Primary School):

1. Frogwell Primary School, Chippenham,

2. Hullavington Primary School, Hullavington, Chippenham,

3. Minety Primary School, Malmesbury

The purpose of this procurement opportunity is to appoint a contractor on a full design and build basis, in the first instance operating under a Pre-Construction Services Agreement and working closely with the Schools and the Council through RIBA Work Stages 1 to 4. This Stage 1 appointment will include the following outputs:

1. Operating under a single PCSA to deliver the RIBA Work Stages 1 to 4 inclusive for each of the three schools including.

2. The appointment of a Design Team to work with the School and the Employers Representative to fully design each of the three projects to the end of RIBA Stage 4 (technical/construction design) and to present the design for approval at the end of each RIBA work stage including cost plans for Employer approval,

3. To develop a detailed programme for RIBA Stages 1 to 7 for acceptance by the Employer for each of the three projects,

4. To obtain Building Regulations approval and Planning Permission for each of the three projects,

5. To work collaboratively with the Employers Representative to produce a Fixed Price Lump Sum to deliver the construction works for each of the three projects for approval by the Employer.

On acceptance by the Council of the fixed price lump sum costs to deliver the construction works for each of the three projects, individual construction contracts will be entered into (JCT Intermediate form of contract with Contractor Design) for each school site. These will be the Stage 2 works, and each school project will be delivered as a standalone project through RIBA Work Stages 5, 6 and 7 (Construction, Handover and in Use).

The indicative forecast cost estimate for the Stage 1 pre-construction works is £450k + VAT and the indicative forecast cost estimate of the Stage 2 post contract works is:

Frogwell Primary School £2.0m + VAT = £2.4m

Hullavington Primary School £2.0m + VAT = £2.4m

Minety Primary School £0.75m + VAT = £0.9m

---------------------------

Total Estimated Construction Cost incl VAT £5.7m

Key Programme Dates as follows:

RIBA Stages 1 to 4 End August 25 to End March 26

Package Pricing Stage End March 26 to End June 26

Final Design & Fixed Price Lump Sum Approvals End June 26 to Mid July 26

RIBA Stage 5 Construction Start August 26

Handover To be agreed for each of the school sites during the pre-construction stage of the project

Wiltshire Council

Since 2021, Wiltshire Council has awarded 3 contracts in this category, worth £12.2m across the 3 that published a value.

Everything Wiltshire Council buys

Similar contracts coming back to market

Contracts in the same category at other buyers, ending in the next 18 months.

How to cite this data

Tender Radar (2026) WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools: Wiltshire Council [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-h6vhtk-04f8e8 (Accessed: 27 November 2026).

The figures change as notices are published, so the citation carries the date you read them.

From Find a Tender, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-h6vhtk-04f8e8.