Running until 11 Jan 2030
Bispham To Cocker Square Coastal Protection Scheme - Call off of SCAPE Civil Engineering Framework - England, Wales and Northern Ireland
Blackpool Council awarded this framework to Balfour Beatty Civil Engineering (SW) Limited for up to £61.3m, running to 11 Jan 2030.
- £61.3m
- Framework ceiling
- 11 Jan 2030
- Runs until
- 1
- Supplier
Find tenders for your company
Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.
Who won
- Balfour Beatty Civil Engineering (SW) Limited
What is being bought
The works comprise a pre-construction contract for the Little Bispham to Bispham & Gynn Square
to Cocker Square Coast Protection Scheme (sections B1.2 & B1.4 of the Blackpool coastal frontage,
respectively). The project comprises a series of Rock Headlands, with associated cross over access
ramps, that are designed to stabilise or reverse the long-term beach lowering trend at the toe of the
Read the full description
The works comprise a pre-construction contract for the Little Bispham to Bispham & Gynn Square
to Cocker Square Coast Protection Scheme (sections B1.2 & B1.4 of the Blackpool coastal frontage,
respectively). The project comprises a series of Rock Headlands, with associated cross over access
ramps, that are designed to stabilise or reverse the long-term beach lowering trend at the toe of the
existing defences. The works also include urgent repairs to the existing coastal defences (e.g. recasting/patch repairs to selected areas such as where there is exposed reinforcement or significant
cracking). This will include recasting beach access steps where required for public safety and major
improvements to the slipway at Little Bispham. The extent and details of the urgent revetment
repairs, recasting access steps and slipway improvements will be developed and fully defined during
the detailed design phase.
Blackpool Council
Since 2021, Blackpool Council has awarded 21 contracts in this category, worth £81.0m across the 20 that published a value.
Everything Blackpool Council buysSimilar contracts coming back to market
Contracts in the same category at other buyers, ending in the next 18 months.
- Offsite Construction Solutions - Lots 1, 2, 3 & 4 extension
Government Commercial Agency · held by Not Applicable · £9.5bn · ends 30 Sept 2027
- National Contractor Framework
Alder Hey Children's NHS Foundation Trust · held by A Buckler (Haulage) Ltd, Aptus Construction Ltd and others · £8.0bn · ends 31 Aug 2027
- Major Projects Framework 2
Places for People Group Limited · held by Robertson Construction Group Limited, Willmott Dixon Construction Limited and others · £4.2bn · ends 3 Apr 2028
- EN:Procure - Framework for Installation, Servicing, Maintenance and Repair Works (GEN4)
EN Procure Ltd · held by A. Connolly Limited, Aaron Services Limited and others · £3.2bn · ends 25 Feb 2028
- prj_4859 - MOJ Constructor Services Framework
Ministry of Justice · held by Wates Construction Limited, ISG Construction Limited and others · £2.5bn · ends 16 Feb 2028
- ALL LOTS
LHC for the Scottish Procurement Alliance (SPA) · held by Bancon Construction Limited, Clark Contracts Limited and others · £750.0m · ends 30 Apr 2027
How to cite this data
Tender Radar (2026) Bispham To Cocker Square Coastal Protection Scheme - Call off of SCAPE Civil Engineering Framework - England, Wales and Northern Ireland: Blackpool Council [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-b5fd17-f763246e-7587-4734-94b5-3163fcf7050a (Accessed: 27 November 2026).
From Contracts Finder, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-b5fd17-f763246e-7587-4734-94b5-3163fcf7050a.