Running until 12 Jul 2028
AP25142 - Modular Hire - St Peters School
Arc Property Services Partnership Limited awarded this to Premier Modular Ltd for £5.2m, running to 12 Jul 2028.
- £5.2m
- Value
- 12 Jul 2028
- Runs until
- 1
- Supplier
Find tenders for your company
Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.
What is being bought
Direct award under the NHS Commercial Solutions Framework for Modular & Pre‐Fabricated Building Solutions and Associated Services (Agreement Reference: 5514‐5512). The requirement covers the design, manufacture, supply, delivery, installation, commissioning and handover of several temporary modular school buildings ("modular learning village"), together with all associated works necessary to provide fully operational teaching accommodation at St Peter's Church of England Junior School, Ruddington, Nottinghamshire.
Read the full description
Direct award under the NHS Commercial Solutions Framework for Modular & Pre‐Fabricated Building Solutions and Associated Services (Agreement Reference: 5514‐5512). The requirement covers the design, manufacture, supply, delivery, installation, commissioning and handover of several temporary modular school buildings ("modular learning village"), together with all associated works necessary to provide fully operational teaching accommodation at St Peter's Church of England Junior School, Ruddington, Nottinghamshire.
The temporary accommodation is required following the emergency closure of the existing school buildings due to unforeseen structural issues.
The modular buildings are to be suitable for occupation as an educational facility and must comply with all relevant statutory requirements, regulations, guidance and standards applicable at the time of design and installation.
Scope of Services
The Supplier is to provide a full turnkey solution, including but not limited to:
- Full design development and coordination
- Manufacture of modular units
- Transportation and delivery to site
- Installation, erection and assembly on site
- All associated groundworks, foundations and substructures
- Connection to all incoming and outgoing services
- Internal fit‐out and finishes (excluding Fixtures, Furniture & Equipment, which will be provided by others)
- Provision of the modular units on a hire‐only basis, including delivery and removal at the end of the service period
- External works necessary for access, egress and statutory compliance
- Testing, commissioning and certification
- Handover documentation and post‐completion support
The contract will be in place for a period of 2 years, with the option to extend for a further 6 months, dependant on the new school construction.
Justification for Direct Award:
St Peter's School was closed at short notice following the discovery of significant structural concerns within the existing buildings. Pupils were temporarily relocated to other schools, placing additional pressure on local education provision. A rapid solution was therefore required to enable pupils to return to their own school site as soon as possible.
Due to the urgen nature of the requirement, Premier Modular and two other suppliers were contacted regarding availability and indicative costs. Premier Modular confirmed that suitable modular units were available (subject to refurbishment and final design) and that installation could be achieved within the required programme. Their costs were competitive (subject to detailed design review and site surveys). Given the urgent nature of the requirement and the need to restore on‐site education provision without delay, a direct award was made.
Additional information: This is a contract award notice required under the Public Contract Regulations 2015 for the emergency requirement.
Arc Property Services Partnership Limited
Since 2021, Arc Property Services Partnership Limited has awarded 1 contract in this category, worth £5.2m across the 1 that published a value.
Similar contracts coming back to market
Contracts in the same category at other buyers, ending in the next 18 months.
- Single Living Accommodation-Programmatic Approach Framework Alliance Contract (SLA-PA FAC) Agreement
Ministry of Defence · held by Bowmer & Kirkland Limited, KIER McAVOY CONSORTIUM and others · £1.1bn · ends 30 Nov 2027
- Modern Methods of Construction (MMC) New Homes Framework NH3
LHC · held by A&E Elkins Limited t/a Elkins Construction, Beattie Passive Operations Limited and others · £600.0m · ends 1 May 2027
- Modular Buildings Framework Alliance Agreement SBS/10091 - Call-Off Project Contract 003718: 709722451 - RAF Marham - Single Living Accommodation (SLA) [Z9F3173Y20]
Ministry of Defence · held by REDS10 (UK) Limited · £72.4m · ends 30 Nov 2027
- ITC Catterick SLA
Ministry of Defence · held by Bowmer and Kirkland Limited · £29.2m · ends 18 Oct 2027
- GRH - Supply and fitout of Modular wards
Gloucestershire Hospitals Subsidiary Company Limited · held by Western Building Systems · £11.0m · ends 30 Sept 2027
- IRM22/7610 The Supply of Field Supplies and Associated Items
Ministry of Defence · held by Central Management Catalogue Agency (UK) Ltd, Millstream (Penthouse Systems) Limited and others · £8.1m · ends 4 Mar 2027
How to cite this data
Tender Radar (2026) AP25142 - Modular Hire - St Peters School: Arc Property Services Partnership Limited [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-b5fd17-e7ab403c-03b2-43c9-943c-9cff6f301eb3 (Accessed: 27 November 2026).
From Contracts Finder, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-b5fd17-e7ab403c-03b2-43c9-943c-9cff6f301eb3.