NZC Retrofit Co-ordinator

Raven Housing Trust Limited awarded this to Baily Garner LLP for £125k, running until 8 Aug 2026.

£125k
Value
8 Aug 2026
Ended
1
Supplier

Find tenders for your company

Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.

Already know you want it? Start your free month

What is being bought

To deliver the zero carbon retrofit work to an agreed standard of 40kwh/m2 or less, on time and to budget by-

• Collating and processing all necessary and relevant data from Raven

• Advising and agreeing with Raven the zero carbon standard to which all our homes will be retrofit using Appendix 1 as a baseline document.

• Ensuring that Raven has a baseline for the energy use and bills for the properties to enable evaluation of the success of the project at the end.

Read the full description

• Surveying each property in detail to ensure suitability for zero carbon works and design the works suitable for that archetype to meet the agreed standard.

• Cloning as much of that survey as possible to other identical archetypes (once surveyed to ensure suitability) and advising Raven what information cannot be cloned and why.

• Putting together the specification of works for each property, using Appendix 1 as a baseline, so we can procure a contractor to carry out these works. This will include but not be limited too, all enabling works, building alterations, setting standards for air tightness and thermal bridging, overheating calculations major component replacement and zero carbon major works.

• Advising on the contract documentation with contractor(s) to ensure delivery to KPIs.

• Helping to recruit the contractor(s) by assisting in the shortlisting and interview process

• Act as Employer's representative, cCarrying out the Principal Designer Role and providing contract management and overseeing the contractor(s)' work on site to ensure that the quality will deliver the contracted outcomes, escalating issues to Raven's manager in good time to enable remedial action.

• Ensure a courteous approach with Raven's own customers and wider residents, working with the Raven customer-facing team as appropriate. Raven's team will lead customer liaison.

• Updating Raven with all relevant information to update their Asset Management database at the end of the project. This will include but not limited to, Heat demand calculations, thermal bridging calculations, air tightness calculations, overheating calculations, a new EPC, details of all major components fitted and warranties and certificates.

• Advising Raven of property tech that we can fit to completed properties to ensure that Raven can monitor the properties to check they continue to perform as designed.

• Providing evaluation and an evaluation report at the end of project success that includes assessment of improvements to EPC, heat demand, actual customer bills and customer satisfaction.

Raven Housing Trust Limited

Since 2021, Raven Housing Trust Limited has awarded 1 contract in this category, worth £125k across the 1 that published a value.

Everything Raven Housing Trust Limited buys

Similar contracts coming back to market

Contracts in the same category at other buyers, ending in the next 18 months.

How to cite this data

Tender Radar (2026) NZC Retrofit Co-ordinator: Raven Housing Trust Limited [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-b5fd17-5dc558aa-24b7-4a6a-bd74-df0be7b49438 (Accessed: 27 November 2026).

The figures change as notices are published, so the citation carries the date you read them.

From Contracts Finder, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-b5fd17-5dc558aa-24b7-4a6a-bd74-df0be7b49438.