A303 Amesbury to Berwick Down (Stonehenge)
Highways England Company Limited awarded this to 3 suppliers for £1.2bn, running to 31 Dec 2031.
- £1.2bn
- Value
- 31 Dec 2031
- Runs until
- 3
- Suppliers
Find tenders for your company
Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.
Who won (3)
- BeMo Tunnelling UK Ltd
- FCC Construcción, S.A.
- Webuild S.p.A.
What is being bought
The planning application for the A303 Stonehenge is still pending redetermination by the Secretary of State for Transport, following the quashing of the decision to grant the Development Consent Order (DCO). This contract will only become live once the Secretary of State has concluded the planning process and only if this process results in a DCO being granted.
The requirements of the scheme that will be the responsibility of the successful applicant are principally captured in the following areas:
1. Design and construction of the new works;
Read the full description
The planning application for the A303 Stonehenge is still pending redetermination by the Secretary of State for Transport, following the quashing of the decision to grant the Development Consent Order (DCO). This contract will only become live once the Secretary of State has concluded the planning process and only if this process results in a DCO being granted.
The requirements of the scheme that will be the responsibility of the successful applicant are principally captured in the following areas:
1. Design and construction of the new works;
The scheme's new works includes the design and construction of the civil, mechanical, electrical and plumbing (MEP), technology and environmental components, key features of the new works are summarised below:
- Tunnel: A twin-bore tunnel, approximately 2 miles (3.3 kilometers) long beneath the Stonehenge World Heritage Site, including tunnel portals and approach structures, tunnel service buildings and plant rooms, tunnel control system and mechanical, electrical and plumbing systems
- Tunnel boring machine - design, manufacture, testing, shipping and on-site assembly
- Carriageway works
- Bridge works to form a viaduct over the River Till, an under bridge for the B3083, a flyover at the A345 Countess Roundabout, and 4 green bridges (Parsonage Down accommodation bridge, Winterbourne Stoke accommodation bridge, A360 Longbarrow Junction & green bridge No. 4)
- Carriageway and tunnel technology
- Landscaping and habitat creation
- Extension of Parsonage Down National Nature Reserve
- Protected species mitigation measures
- Ensure rights of way and private means of access
- Mainline earthworks
- Utilities works
2. Refurbishment, replacement and modification of existing assets;
There are works required on existing assets under the current ownership of both National Highways and Wiltshire Council. Continued engagement and consultation will be required with both parties throughout the design and construction phases for these elements including:
- Existing A303 de-trunking works
- Demolition works and site clearance works
- Modification works to existing structures
3. Maintenance and operation during construction
Maintenance and operation of the existing A303 within the site boundary will be required for the duration of the construction works. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities.
4. Post construction maintenance period
There is an extended maintenance period (minimum of 5 years, maximum of 7 years) after construction to 'prove' the tunnel performs as intended. Maintenance is included as part of this period and the Contractor will be responsible for all elements of the infrastructure associated with the tunnel and its approaches. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities and tunnel operations.
Highways England Company Limited
Since 2021, Highways England Company Limited has awarded 3 contracts in this category, worth £1.2bn across the 3 that published a value.
Everything Highways England Company Limited buysSimilar contracts coming back to market
Contracts in the same category at other buyers, ending in the next 18 months.
- Blackfriars Bridge Phase 2 - Refurbishment
The Mayor and Commonalty and Citizens of the City of London · held by Taziker Industrial Ltd · £9.0m · ends 8 Nov 2027
- PLACE1085H CCTV Drainage Surveys and Repairs
Derbyshire County Council · held by Amelio Group · £5.0m · ends 13 Sept 2027
- Manchester Street Viaduct Main Contractor
Oldham Council · held by Eric Wright Civil Engineering Limited · £3.9m · ends 27 Nov 2026
- DNWP0040/LOT1A/ HEx-1 Laydown area excavation and pour
Sellafield Ltd · held by Amentum Clean Energy Limited · £3.4m · ends 1 May 2028
- Bridge Maintenance Framework
Blackburn with Darwen Borough Council · held by A E Yates, A J Bretherton Groundworks & Plant Hire and others · £2.6m · ends 31 Dec 2027
- MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 1 Highways Contract
North Somerset Council · held by Amalgamated Construction Ltd · £1.9m · ends 26 Feb 2027
How to cite this data
Tender Radar (2026) A303 Amesbury to Berwick Down (Stonehenge): Highways England Company Limited [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-b5fd17-4e3e45c5-c19c-49b3-b92c-31bcc464ec80 (Accessed: 27 November 2026).
From Contracts Finder, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-b5fd17-4e3e45c5-c19c-49b3-b92c-31bcc464ec80.