Running until 10 Feb 2046

Local Electric Vehicle Infrastructure

Kent County Council awarded this to Urban Fox Networks (Kent) Limited for £290.0m, running to 10 Feb 2046.

£290.0m
Value
10 Feb 2046
Runs until
1
Supplier

Find tenders for your company

Paste your website and we score this week’s UK public sector tenders against it, each with a reason. Then start your free month with those matches.

Already know you want it? Start your free month

Who won

  • Urban Fox Networks (Kent) LimitedSME, as the notice states

    Companies House 16991096 · 1 other contract with Kent County Council since 2021

What is being bought

The Kent County Council (KCC) has awarded a contract for Local Electric Vehicle Infrastructure (LEVI). In line with Government plans to decarbonise transport and end the sale of petrol and diesel cars, Kent County Council is preparing the network for zero emission vehicles and in doing so supporting the ambition to reach net zero by 2050.

Read the full description

In March 2022 the Government published Taking charge: the electric vehicle infrastructure strategy which outlined their intention that Local Authorities should play a leading role in ensuring equitable access to Electric Vehicle Charge Points (EVCP) in their localities.

This was followed up in 2023 when the Government launched the Local Electric Vehicle Infrastructure (LEVI) fund, which was designed to help deliver a step change in the deployment of local, primarily low power, on-street charging infrastructure to accelerate the commercialisation of, and investment in, the local charging infrastructure sector.

The LEVI fund is administered by the Office of Zero Emissions Vehicles (OZEV), who want to see Tier 1 Authorities enabling charging for those in most need. In the current landscape of electric vehicle (EV) charging, OZEV have made it clear that the primary focus should be on existing residential properties without the ability to charge their vehicles at home.

The Council will work with the supplier to develop a reliable and high-quality public on-street charge point network. This will enable equal levelling up across the county by providing the infrastructure needed for the residents of Kent to make the switch to EVs, particularly for those without the ability to charge at home.

The Individual Contract is a Concession Contract with a contractual term of 20 years. The Supplier will work with the Customer to plan and deliver a network of primarily 7 kWh < 22 kWh charge points. However, other charge point types and speeds may be considered if needed and subject to agreement by The Customer. The installation period of the charge points will take place during the first 10 years of the contract term. Based on the data provided by CENEX and the project dependencies, assumptions, constraints and risks, KCC have set the below indicative targets for installations:

• Infrastructure for 4,000 Sockets by 2030

• Infrastructure for 10,000 Sockets by 2035

The Council has successfully secured LEVI capital funding.

Additional information: The Tender Notice reference number is KENT001-DN753323-75471642.

Kent County Council

Since 2021, Kent County Council has awarded 2 contracts in this category, worth £290.0m across the 1 that published a value.

Everything Kent County Council buys

Similar contracts coming back to market

Contracts in the same category at other buyers, ending in the next 18 months.

How to cite this data

Tender Radar (2026) Local Electric Vehicle Infrastructure: Kent County Council [Dataset]. Professor AI. Available at: https://tender-radar.co.uk/contracts/ocds-b5fd17-1a9747f3-cf6e-4608-8360-66fa7627dd6d (Accessed: 27 November 2026).

The figures change as notices are published, so the citation carries the date you read them.

From Contracts Finder, published under the Open Government Licence v3.0. Always check the official notice before bidding. Contract reference ocds-b5fd17-1a9747f3-cf6e-4608-8360-66fa7627dd6d.